C&J Redi Mix Concrete

For after-hours changes or cancellations, call Jody at (970) 799-8683. Last minute cancellation fees may apply. Prices are quoted upon request for specific mixes. Prices do not include applicable sales tax.

An additional fuel surcharge (not included in our online estimate) will be applied to delivery fees as it fluctuates with current gas prices.

Redi Mix Concrete

MATERIAL DESCRIPTION

UNIT OF MEASURE

CONTRACTOR PRICE

RETAIL PRICE

CALC

3000 PSI Concrete (Footers)

Cubic Yard

$199.75

$203.75

3000 PSI No Air Concrete

Cubic Yard

$199.75

$203.75

3500 PSI Concrete (Walls/Footers)

Cubic Yard

$211.75

$215.75

3500 PSI No Air Concrete

Cubic Yard

$202.50

$206.50

3500 Straight Cement

Cubic Yard

$205

$209

4000 PSI Concrete (Flatwork)

Cubic Yard

$213.50

$217.50

4000 PSI No Air Concrete

Cubic Yard

$202.50

$206.50

4000 Straight Cement

Cubic Yard

$216

$220

4000 3/8 PSI Concrete

Cubic Yard

$233

$237

4000 50/50 PSI Concrete

Cubic Yard

$223

$227

Class D 4500 PSI Concrete (City SPEC)

Cubic Yard

$244

$248

Class D 4500 PSI (Low Slump)

Cubic Yard

$244

$248

5000 PSI Concrete

Cubic Yard

$219.75

$223.75

5000 PSI No Air Concrete

Cubic Yard

$219.75

$233.75

BZ Mix

Cubic Yard

$252

$256

Flow Fill Premium (Backfill)

Cubic Yard

$144.75

$149.75

Additives

MATERIAL DESCRIPTION

UNIT OF MEASURE

PRICE

Chloride Accelerator (Winter) .25%

Cubic Yard

$1.20

Chloride Accelerator (Winter) .5%

Cubic Yard

$2.40

Chloride Accelerator (Winter) 1%

Cubic Yard

$4.80

Chloride Accelerator (Winter) 1.5%

Cubic Yard

$7.20

Chloride Accelerator (Winter) 2%

Cubic Yard

$9.60

Chloride Accelerator (Winter) 3%

Cubic Yard

$14.40

Non-Chloride Accelerator (Winter) .25%

Cubic Yard

$1.50

Non-Chloride Accelerator (Winter) .5%

Cubic Yard

$3

Non-Chloride Accelerator (Winter) 1%

Cubic Yard

$6

Non-Chloride Accelerator (Winter) 1.5%

Cubic Yard

$9

Non-Chloride Accelerator (Winter) 2%

Cubic Yard

$12

Non-Chloride Accelerator (Winter) 3%

Cubic Yard

$14.40

On-Site Non-Chloride Accelerator .5%

Cubic Yard

$2.40

On-Site Non-Chloride Accelerator 1%

Cubic Yard

$4.80

On-Site Non-Chloride Accelerator 1.5%

Cubic Yard

$9

On-Site Non-Chloride Accelerator 2%

Cubic Yard

$12

Hydration Stabilizer-Retarder (Summer)

1 Hour

$2

Micro Fiber/Regular Fiber

Cubic Yard

$7

Extra Charges

MATERIAL DESCRIPTION

UNIT OF MEASURE

PRICE

Saturday Pours

Cubic Yard

$20

Hot Water (Oct 15 – April 15)

Cubic Yard

$7

Short Yard Charge (1-3.75 CY)

Cubic Yard

$27

>